• Power distribution boards
  • Control panels
  • Smart panels
  • Operator panels
  • Ei•pdu - hot swappable
  • Busbar
  • Emergency power
  • Engineering
  • Project portal
  • News
  • SHEQ
  • Certificates
  • Privacy
  • Contact
overzicht

Oldelft Ultrasound

Ultrasound impression
Situatie op locatie
  • Ultrasound impression
  • Situatie op locatie

Gepubliceerd: 14-10-2020 | 15:40:00

Laatst gewijzigd: 14-10-2020 | 15:40:48

September 2020 - Delft, The Netherlands

 

Oldelft Ultrasound develops and manufactures equipment for medical ultrasound diagnostics. The new head office that is being built in Delft will soon provide space for innovations within the medical sector. Oldelft is going for a BREEAM Excellent certification.

Commissioned by Terberg Totaal Installations, Elektro Internationaal provides the distribution boards for the new Ultrasound main building. By making efficient use of the spaces in the building and smart engineering, we were able to show this customer our added value. The main distribution board has been placed in a corner arrangement to make the best use of the small space available.

The 1600A ’corner panel’ is built in Schneider Electric’s Prisma P (IP55) system and consists of two parts of 1.2 meters each with a total weight of 400 kg. The parts were connected on location. In addition, Elektro Internationaal supplies 5 sub-distributors in Prisma GK (IP55) in standing and wall versions.

 

[image: Oldelft.com]

RETURN TO PROJECT OVERVIEW

Gerelateerde artikelen


13-01-2021 - Outpatient clinics Ghana

Tags


project , power distribution , prisma p , prisma gk , panel building

Overig nieuws


13-01-2021 | 11:16:00 - Outpatient clinics Ghana
02-12-2020 | 15:46:00 - Terraced Tower
18-11-2020 | 16:02:00 - Kuraray Advanced Materials
04-09-2020 | 15:21:11 - Westfort meat processing
04-09-2020 | 15:16:37 - Inntel Hotel Landmark
04-09-2020 | 15:12:23 - Schiphol Ugrade D-Pier
04-09-2020 | 15:07:09 - ABN AMRO Refresh
04-09-2020 | 15:02:00 - Schiphol refurbishment Terminal 1
27-03-2020 | 14:34:00 - Rubis Terminal Botlek
18-03-2020 | 14:00:00 - Corona measures
24-02-2020 | 14:00:00 - Student complex Science Park
03-02-2020 | 14:00:00 - Oiltanking Amsterdam
30-01-2020 | 10:00:00 - FloriWorld
27-11-2019 | 14:53:00 - Vergeer Holland Cheese
27-11-2019 | 14:27:00 - Hamburger Factory
23-08-2019 | 08:00:00 - New data center NEP
02-08-2019 | 08:00:00 - Produlab Pharma
14-06-2019 | 08:00:00 - Recovery of main distributor
06-06-2019 | 08:38:00 - Halogen-free wiring solutions
03-05-2019 | 08:00:00 - Thermal Baths Berendonk
03-05-2019 | 08:00:00 - Data center Nairobi
10-04-2019 | 09:44:00 - National Storage for Archives
10-04-2019 | 09:30:00 - Renovation Hotel Van der Valk Haarlem
08-02-2019 | 12:56:00 - Keeping tabs on product development
01-02-2019 | 08:00:00 - Dow Benelux
19-12-2018 | 08:48:00 - Insight into power consumption
05-12-2018 | 14:43:00 - Strong in the hotel business
09-11-2018 - Royal FloraHolland
09-10-2018 - Out-of-the-box power distribution
09-10-2018 - Datacenter project

Laatste nieuws

Tagcloud


  • busbar
  • emergency power
  • main distributor
  • okken
  • power distribution
  • prisma gk
  • prisma p
  • project
  • sub distributor
  • ups

Zoeken in nieuws


Zoek

Contactgegevens

Elektro Internationaal B.V.
Pompmolenlaan 17
3447 GK Woerden
t: +31 348 420 540
f:
info@ei-woerden.nl

Routeplanner
Btwnr.
Kvknr.

Elektro Internationaal

 

Pompmolenlaan 17
3447 GK Woerden
The Netherlands
Trade register Utrecht No. 30088530
VAT No. NL801238146B02
Phone: +31 (0)348 420540
www.elektro-internationaal.com

 

 

Home

Products

Projects

About us

Contact

Your question or remark:

 

Master

 

 

Dekra

Copyright 2021 - Elektro Internationaal B.V.
Inloggen | Sitehand - Design website met CMS | Ziber - Website software | Design by Pencilpoint | creatief in vorm & inhoud