• Power distribution boards
  • Control panels
  • Smart panels
  • Operator panels
  • Ei•pdu - hot swappable
  • Busbar
  • Emergency power
  • Engineering
  • Service activities
  • Customization & expansion
  • Copper work on site
  • Maintenance & inspections
  • Project portal
  • News
  • SHEQ
  • Certificates & Conditions
  • Privacy
  • Contact
overzicht

Recovery of main distributor

Office building Utrecht

Le Mirage2
Le Mirage3
Le Mirage4
Le Mirage5
Le Mirage6
Le Mirage7
Le Mirage8
  • Le Mirage2
  • Le Mirage3
  • Le Mirage4
  • Le Mirage5
  • Le Mirage6
  • Le Mirage7
  • Le Mirage8

May 2019 - Utrecht, The Netherlands

 

The service technicians of Elektro Internationaal stand for their work. They connect installations on site, perform periodic maintenance and replace or repair distribution systems and controls in the event of an emergency. This was also the case recently in office building Le Mirage in Utrecht. There, a short-circuit took place on 19 April in the main distributor of the 21-storey office complex. This caused the entire building to be without electricity.

 

Although the cause of the short-circuit in the 3,200Amp distributor could not be determined, it was soon discovered that the compartments containing the different groups for the end users were still in tact, so that an emergency power supply could be installed. Permanent maintenance partner Electriciteitswerken Kronenburg urgently arranged for the installation of a mobile emergency unit with diesel stock from Voet Energy Solutions. The building was supplied with the necessary power again. Voet then quickly came up with a smaller and more cost-effective generator with back-up, which also supplied enough power to keep the power supply working. Although all parties were well-informed about the temporary solution of the problem, the wish was of course to look for a permanent solution as quickly as possible. For this, a new main distributor was initially thought of. A costly matter with a delivery time of at least 3 months. And even more expensive because of the daily costs of the emergency power unit.

 

Mecano-like

Elektro Internationaal being the original supplier of the panel built in 2007 in Cubic, was contacted by Kronenburg for a new main distributor. However, service manager André de Widt thought it wise to determine on site if there was another solution tot he problem. An inventory on the spot showed that repairing the damaged middle section of the distributor was an option. A major advantage was the Cubic system in which the distributor was built. The ”mecano-like” aspect of this originally Danish system makes it relatively easy to replace parts and components. The middle section could not be replaced as a whole because there was simply not enough room to maneuver. It was decided to restore the middle segment part by part.

 

Involved

After receiving a go for the on-site repair of the panel, service engineers Mario de Jong and Eric Koudijs dropped a planned personenel outing in order to get the job done in one weekend. The involvement that the engineers have shown is particularly appreciated. Twice for 12 hours, they continued working on the repair of all copper work, the rail supports, the main fuse, the emergency power controls and the incoming power supplies from the transformer. Kronenburg replaced the damaged cabling from the transformer. When members of the management of Le Mirage came to view the work after the repairs were done, nothing of the original damage showed.

 

Best solution

The entire process from the moment that Elektro Internationaal was informed to determining the damage, the issuing and approval of the quotation, the planning of the work, the ordering of the required new components, the thinking out of new controls, the execution and testing of the controls, was completed within 4 weeks. The repair work has proven to be the best solution for all those involved. It provided the client with the necessary cost effectiveness. And moreover a main ditribution panel that will last for years!

 

RETURN TO PROJECT OVERVIEW

Gerelateerde artikelen


16-08-2023 - Power for tomato farm in the desert
21-07-2023 - Expansion Data Center Kenia

Tags


project , main distributor , recovery

Overig nieuws


16-08-2023 - Power for tomato farm in the desert
21-07-2023 - Expansion Data Center Kenia
29-06-2023 - Smart demo and show panel
26-05-2023 - Static Transfer Switch
24-04-2023 - Medical Transformer Panels
23-03-2023 - Okken panels for Royal A-Ware
30-01-2023 - Bidirectional power converter AC<>DC
30-12-2022 - Renovation University of Utrecht
21-12-2022 - Merry Christmas
04-11-2022 - ISO audit successful
04-11-2022 - U-shaped Okken panel
04-11-2022 - Prisma G SeT panels for PostNL
04-08-2022 - OPCW Pijnacker-Nootdorp
04-08-2022 - Distribution panels with generator control for large data centre E-House
04-08-2022 - Okken panels for tomato farm in the desert
04-08-2022 - Replacement distributor Eneco Heat Production
04-08-2022 - Smart panels for Xerimis
04-08-2022 - Distribution Centre Scotch & Soda
17-06-2022 - Master Digital Panel
17-06-2022 - Renovation emergency power control Haluco
21-12-2021 - A smart 2022
21-12-2021 - MCC for KLM test cel
21-12-2021 - Main distributors in Cubic for Innocent
06-08-2021 - The Joan
06-08-2021 - Amsterdam International Community School
06-08-2021 - Smart panels for labaratories RIVM
29-07-2021 - Poultry slaughterhouse Esbro
29-04-2021 - a.s.r. Green Parking
21-04-2021 - Mall of the Netherlands
04-03-2021 - Multi-year renovation of LIDL stores
04-03-2021 - Ditribution panels for Zwolle train station

Laatste nieuws

Tagcloud


  • busbar
  • datacenter
  • main distributor
  • okken
  • panel building
  • power distribution
  • prisma gk
  • prisma p
  • project
  • sub distributor

Zoeken in nieuws


Zoek

Contactgegevens

Elektro Internationaal B.V.
Pompmolenlaan 17
3447 GK Woerden
t: +31 348 420 540
f:
info@ei-woerden.nl

Routeplanner
Btwnr.
Kvknr.

Elektro Internationaal

 

Pompmolenlaan 17
3447 GK Woerden
The Netherlands
Trade register Utrecht No. 30088530
VAT No. NL801238146B02
Phone: +31 (0)348 420540
www.elektro-internationaal.com

 

 

Home

Products

Projects

About us

Contact

Dekra Federatie Paneelbouw

Copyright 2025 - Elektro Internationaal B.V.
Inloggen | Ziber Website | Design by Pencilpoint | creatief in vorm & inhoud