• Power distribution boards
  • Control panels
  • Smart panels
  • Operator panels
  • Ei•pdu - hot swappable
  • Busbar
  • Emergency power
  • Engineering
  • Service activities
  • Customization & expansion
  • Copper work on site
  • Maintenance & inspections
  • Project portal
  • News
  • SHEQ
  • Certificates & Conditions
  • Privacy
  • Contact
overzicht

Government Office ‘De Knoop’

Distribution systems with complex takeover constructions

de knoop
De Knoop
De Knoop2
de knoop
De Knoop
  • De Knoop
  • De Knoop2
  • de knoop

May 2018, Utrecht – The Netherlands

 

In May, the brand new Rijkskantoor De Knoop on the Croeselaan in Utrecht was officially opened. A consortium of Strukton, Facilicom and Ballast Nedam developed the former ‘Knoop’ barracks under the name R Creators into a state-of-the-art and sustainable office building commissioned by the Central Government Real Estate Agency. The main building has a total gross area of 30,000 m2 and accommodates around 1,700 employees from various government departments.

 

Commissioned by R Creators, Elektro Internationaal developed and produced the general energy supply for the central part of the building. Starting with a main distribution panel in Schneider Electric’s Prisma P system. The design (in 4b) involved a considerable challenge. In the panel (with a total length of 6.7 meters) a large number of separately compartmentalized groups had to be included. In the end the distributor was delivered in 4 parts. The panel contains two incoming power supplies and two general groups.

 

Extremely hig short-circuit resistance
The main distributor has a total power of 2 x 2,000 Amp. An option has been provided to parallel the power supplies. To accomplish this the rail system has been set up for 70 kA. As a result, the panel has a very high short-circuit resistance for a P-board.

 

Five takeover constructions
In addition, the main board contains a number of preferential groups. To keep them running in the event of an emergency the coupling circuit breaker switches off and the generator takes over. Elektro Internationaal also connected generator controls. As if that were not enough, four more takeover constructions were made in the main distribution board to keep all preferential groups under voltage under all possible circumstances, with a mobile NSA as ultimate fallback

 

Staggered preferential groups
Elektro Internationaal also supplied 109 sub-distributors in Prisma G, of which 90 have a complex construction due to existing preferred groups. Preference has also been placed within these preferred groups. When these groups come to run on the generator, a staggering is applied in electrical load. So there are a number of groups that can be switched off in the event of too high a load. The main groups in the sub-distributors are kept under tension in the event of emergencies by a UPS system.

 

KWh measurement
All sections, groups and power supplies within the entire distribution system are also measured for KWh and connected to the user’s Building Management System.

 

[*Impressions: Rijnboutt]

 

RETURN TO PROJECT OVERVIEW

 

 

 

Gerelateerde artikelen


16-08-2023 - Power for tomato farm in the desert

Tags


project , power distribution , main distributor , sub distributor , generator controls , nsa , measurement

Overig nieuws


16-08-2023 - Power for tomato farm in the desert
21-07-2023 - Expansion Data Center Kenia
29-06-2023 - Smart demo and show panel
26-05-2023 - Static Transfer Switch
24-04-2023 - Medical Transformer Panels
23-03-2023 - Okken panels for Royal A-Ware
30-01-2023 - Bidirectional power converter AC<>DC
30-12-2022 - Renovation University of Utrecht
21-12-2022 - Merry Christmas
04-11-2022 - ISO audit successful
04-11-2022 - U-shaped Okken panel
04-11-2022 - Prisma G SeT panels for PostNL
04-08-2022 - OPCW Pijnacker-Nootdorp
04-08-2022 - Distribution panels with generator control for large data centre E-House
04-08-2022 - Okken panels for tomato farm in the desert
04-08-2022 - Replacement distributor Eneco Heat Production
04-08-2022 - Smart panels for Xerimis
04-08-2022 - Distribution Centre Scotch & Soda
17-06-2022 - Master Digital Panel
17-06-2022 - Renovation emergency power control Haluco
21-12-2021 - A smart 2022
21-12-2021 - MCC for KLM test cel
21-12-2021 - Main distributors in Cubic for Innocent
06-08-2021 - The Joan
06-08-2021 - Amsterdam International Community School
06-08-2021 - Smart panels for labaratories RIVM
29-07-2021 - Poultry slaughterhouse Esbro
29-04-2021 - a.s.r. Green Parking
21-04-2021 - Mall of the Netherlands
04-03-2021 - Multi-year renovation of LIDL stores
04-03-2021 - Ditribution panels for Zwolle train station

Laatste nieuws

Tagcloud


  • busbar
  • datacenter
  • main distributor
  • okken
  • panel building
  • power distribution
  • prisma gk
  • prisma p
  • project
  • sub distributor

Zoeken in nieuws


Zoek

Contactgegevens

Elektro Internationaal B.V.
Pompmolenlaan 17
3447 GK Woerden
t: +31 348 420 540
f:
info@ei-woerden.nl

Routeplanner
Btwnr.
Kvknr.

Elektro Internationaal

 

Pompmolenlaan 17
3447 GK Woerden
The Netherlands
Trade register Utrecht No. 30088530
VAT No. NL801238146B02
Phone: +31 (0)348 420540
www.elektro-internationaal.com

 

 

Home

Products

Projects

About us

Contact

Dekra Federatie Paneelbouw

Copyright 2025 - Elektro Internationaal B.V.
Inloggen | Ziber Website | Design by Pencilpoint | creatief in vorm & inhoud