• Power distribution boards
  • Control panels
  • Smart panels
  • Operator panels
  • Ei•pdu - hot swappable
  • Busbar
  • Emergency power
  • Engineering
  • Service activities
  • Customization & expansion
  • Copper work on site
  • Maintenance & inspections
  • Project portal
  • News
  • SHEQ
  • Certificates & Conditions
  • Privacy
  • Contact
overzicht

Power for mega cooling DC

Main distributor, sub-distributors and pv installation

Overzicht hal_klein
_H4A7316b
paprika_klein
  • Overzicht hal_klein
  • _H4A7316b
  • paprika_klein

April 2017, Eindhoven - The Netherlands

 

A continuous and trouble-free power supply is essential for almost every company. That certainly applies to the new distribution center of Scherpenhuizen B.V. in Eindhoven, the Netherlands. Expert knowledge and a flexible attitude were crucial to set up the power supply under considerable time pressure. Elektro Internationaal B.V. turned out to be the right partner for the job.

The new distribution center of fresh supplier Scherpenhuizen, which is on the industrial site Acht-Noord in Eindhoven, stretches out over an area measuring eight to nine football fields. The new dc is mainly used for packaging and distributing fruit and vegetables. The total size of the building is approximately 44,000 m2, of which 34,000 m2 hall, 6,000 m2 mezzanine and a CO2 neutral office of 3,200 m2.

BREEAM ‘OUTSTANDING’
Corporate social responsibility is of paramount importance at Scherpenhuizen and it was therefore decided to set up the new building along the BREEAM methodology. The ambition was to achieve the highest level, BREEAM ‘Outstanding’. To realize this ambition, a large number of sustainable measures have been included in the design, including a completely gas-free climate control system, LED lighting throughout the building and 1,966 PV panels on the roof that provide the cooling system with electricity.

MEGA COOLING HALL
Commissioned by electro-technical installer Mansveld, Elektro Internationaal B.V. designed and produced the main distribution panel and nineteen sub-distribution panels. The distributor for the PV installation was also created in the Elektro Internationaal workshop. With a total power of 3,200 Amps, that’s a heavy distributor. ”That is indeed a powerful panel, but we do not shy away from that”, says project leader Utilities Dirk Blom. “We can deliver up to 7,300 Ampere, which are used in data centers, for example. This project concerns a gigantic hall that needs to be cooled and huge distances over which we have to transport the energy. The majority of the current, about 1,000 Amp, goes to the cooling installation. We went all out to make everything come together as planned.”

INTEGRATION OF COMPONENTS
Elektro Internationaal had to do the job under considerable time pressure. The panel builder also had to take into account intermediate adjustments to the design. “The number of groups had to be expanded and the planned route of the third-party busbar system was not feasible. For us that meant adjusting the connections on the distribution panels. Eventually we had to make an additional distribution system under the busbar system to make it fit properly. That is quite a challenge with a 3,200 Amp installation.

The correct installation of the components of various suppliers (KNX system, energy meters and busbar system) was entrusted to Elektro Internationaal. Blom: “All these products come together in the distribution panel. This requires knowledge and a flexible attitude. With good suppliers behind us - such as Schneider Electric - and an organization that can act quickly, we can deliver this kind of customization.”

RELIABLE AND FLEXIBLE
Ondanks de uitdagingen wist het projectteam onder leiding van Dirk Blom binnen de strakke tijdsplanning succesvol op te leveren, naar grote tevredenheid van installateur Mansveld. “We hebben Elektro Internationaal benaderd omdat we ze kennen als een betrouwbare partij die op zeer korte termijn kan bouwen en leveren. Dat is ook weer op dit project gebleken. We hebben voor het eerst contact gehad in week 51 en in februari is het project opgeleverd. Een mooi staaltje werk.”

Despite the challenges, the project team, led by Dirk Blom, managed to deliver successfully within the tight time schedule. Much to the satisfaction of installer Mansveld: “We approached Elektro Internationaal because we know them to be a reliable party that can build and deliver on short notice. That has proven itself true yet again during this project. We had first contact in week 51 and the project was delivered in February. A fine example of a job well done!”

 

RETURN TO PROJECT OVERVIEW

 

 

Gerelateerde artikelen


16-08-2023 - Power for tomato farm in the desert

Tags


project , power distribution , main distributor , sub distributor , pv distributor

Overig nieuws


16-08-2023 - Power for tomato farm in the desert
21-07-2023 - Expansion Data Center Kenia
29-06-2023 - Smart demo and show panel
26-05-2023 - Static Transfer Switch
24-04-2023 - Medical Transformer Panels
23-03-2023 - Okken panels for Royal A-Ware
30-01-2023 - Bidirectional power converter AC<>DC
30-12-2022 - Renovation University of Utrecht
21-12-2022 - Merry Christmas
04-11-2022 - ISO audit successful
04-11-2022 - U-shaped Okken panel
04-11-2022 - Prisma G SeT panels for PostNL
04-08-2022 - OPCW Pijnacker-Nootdorp
04-08-2022 - Distribution panels with generator control for large data centre E-House
04-08-2022 - Okken panels for tomato farm in the desert
04-08-2022 - Replacement distributor Eneco Heat Production
04-08-2022 - Smart panels for Xerimis
04-08-2022 - Distribution Centre Scotch & Soda
17-06-2022 - Master Digital Panel
17-06-2022 - Renovation emergency power control Haluco
21-12-2021 - A smart 2022
21-12-2021 - MCC for KLM test cel
21-12-2021 - Main distributors in Cubic for Innocent
06-08-2021 - The Joan
06-08-2021 - Amsterdam International Community School
06-08-2021 - Smart panels for labaratories RIVM
29-07-2021 - Poultry slaughterhouse Esbro
29-04-2021 - a.s.r. Green Parking
21-04-2021 - Mall of the Netherlands
04-03-2021 - Multi-year renovation of LIDL stores
04-03-2021 - Ditribution panels for Zwolle train station

Laatste nieuws

Tagcloud


  • busbar
  • datacenter
  • main distributor
  • okken
  • panel building
  • power distribution
  • prisma gk
  • prisma p
  • project
  • sub distributor

Zoeken in nieuws


Zoek

Contactgegevens

Elektro Internationaal B.V.
Pompmolenlaan 17
3447 GK Woerden
t: +31 348 420 540
f:
info@ei-woerden.nl

Routeplanner
Btwnr.
Kvknr.

Elektro Internationaal

 

Pompmolenlaan 17
3447 GK Woerden
The Netherlands
Trade register Utrecht No. 30088530
VAT No. NL801238146B02
Phone: +31 (0)348 420540
www.elektro-internationaal.com

 

 

Home

Products

Projects

About us

Contact

Dekra Federatie Paneelbouw

Copyright 2025 - Elektro Internationaal B.V.
Inloggen | Ziber Website | Design by Pencilpoint | creatief in vorm & inhoud